{"id":228,"date":"2025-11-30T17:34:01","date_gmt":"2025-11-30T19:34:01","guid":{"rendered":"http:\/\/tipo-ndt.com\/?page_id=228"},"modified":"2025-11-30T17:34:21","modified_gmt":"2025-11-30T19:34:21","slug":"references-clients","status":"publish","type":"page","link":"https:\/\/tipo-ndt.com\/index.php\/references-clients\/","title":{"rendered":"References \/ Clients"},"content":{"rendered":"<body>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Our services are trusted by leading companies in the <strong>energy, oil, construction, and metalworking industries<\/strong>.<br><strong>Trust and quality <\/strong>are the foundation of our business.<\/p>\n<\/blockquote>\n\n\n\n<p><strong>CONSTRUCTION:<\/strong><\/p>\n\n\n\n<p>\u201cGradska toplana\u201d Doboj \u2013 Overhaul of hot-water boilers 2\u00d730 MW; overhaul of the tube system<\/p>\n\n\n\n<p>\u201cBanjalu\u010dka pivara\u201d \u2013 Continuous supply of steam boilers 16 and 20 t\/h; replacement of return chambers<\/p>\n\n\n\n<p>\u201cImpro\u201d Prijedor \u2013 Overhaul of steam boilers 2\u00d715 t\/h; overhaul of the tube system<\/p>\n\n\n\n<p>\u201cPrijedor\u010danka\u201d Prijedor \u2013 Overhaul of steam boiler 2\u00d75 t\/h; replacement of the tube system<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Reconstruction of the hydrogen station<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Fabrication of a 3 MW technological heat exchanger<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Delivery and installation of a steam boiler 18 t\/h<\/p>\n\n\n\n<p>\u201cGeneral Hospital\u201d Prijedor \u2013 Delivery and installation of boilers 2\u00d72 MW<\/p>\n\n\n\n<p>\u201cClinical Center\u201d Banja Luka \u2013 Overhaul of 5 MW boilers<\/p>\n\n\n\n<p>\u201cClinical Center\u201d Banja Luka \u2013 Fabrication and installation of heat exchangers 2\u00d71.5 MW<\/p>\n\n\n\n<p>\u201cConstruction Institute\u201d Prijedor \u2013 Hot-water connection for building G-S<\/p>\n\n\n\n<p>\u201cConstruction Institute\u201d Prijedor \u2013 Reconstruction of a 2 MW substation, building G-S<\/p>\n\n\n\n<p>\u201cConstruction Institute\u201d Prijedor \u2013 Heating installation for building G-S, area 3,200 m\u00b2<\/p>\n\n\n\n<p>\u201cTrgoprodaja\u201d Prijedor \u2013 Heating installation for commercial facilities \u2013 Marketplace<\/p>\n\n\n\n<p>\u201cBDB Agent\u201d Prijedor \u2013 Central heating installation \u2013 Celpak facility<\/p>\n\n\n\n<p>\u201cTE Ugljevik\u201d \u2013 Ugljevik \u2013 Overhaul works<\/p>\n\n\n\n<p>\u201cBDB Agent\u201d Prijedor \u2013 Central heating installation \u2013 commercial\/residential building, P.P. Njego\u0161a<\/p>\n\n\n\n<p>\u201cGradska toplana\u201d Doboj \u2013 Hot-water pipeline \u00d8219, \u201cSun\u010dana padina\u201d building; pipeline installation and radiographic inspection of welded joints<\/p>\n\n\n\n<p>\u201cTE Gacko\u201d \u2013 Gacko \u2013 Overhaul works<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Overhaul of 12 t\/h steam boiler<\/p>\n\n\n\n<p>\u201cNovi rudnici Ljubija\u201d Prijedor \u2013 Overhaul of hot-water boilers 2\u00d77 MW<\/p>\n\n\n\n<p>\u201cLipa drvo\u201d Omarska \u2013 Installation of a new boiler room 6.5 MW<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Delivery and installation of steam boiler plant 8 t\/h<\/p>\n\n\n\n<p>\u201cPrijedor\u010danka\u201d Prijedor \u2013 Installation of boiler plant 3+7 t\/h; delivery and installation of thermal and chemical water treatment system<\/p>\n\n\n\n<p>\u201cGradska toplana\u201d Doboj \u2013 Reconstruction of 30 MW hot-water boiler (tube system)<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Reconstruction of technological columns<\/p>\n\n\n\n<p>\u201cPrijedor\u010danka\u201d Prijedor \u2013 Reconstruction of distillation column heat exchanger<\/p>\n\n\n\n<p>\u201cStandard\u201d Prnjavor \u2013 Boiler plant rehabilitation<\/p>\n\n\n\n<p>\u201cOMV\u201d Banja Luka \u2013 Installation of mechanical installations, HVAC and heating systems<\/p>\n\n\n\n<p>\u201cOMV\u201d \u0160amac \u2013 Installation of mechanical installations, HVAC, heating systems<\/p>\n\n\n\n<p>\u201cGeneral Hospital\u201d Prijedor \u2013 Reconstruction of boilers and heating system<\/p>\n\n\n\n<p>\u201cOil Refinery\u201d Modri\u010da \u2013 Reconstruction of technological equipment<\/p>\n\n\n\n<p>\u201cOil Refinery\u201d Modri\u010da \u2013 General overhaul of 50 t\/h steam boiler<\/p>\n\n\n\n<p>\u201cToplana\u201d Banja Luka \u2013 Overhaul of boiler IV 58 MW \u2013 tube system replacement<\/p>\n\n\n\n<p>\u201cGradska toplana\u201d Doboj \u2013 General overhaul of boiler no. II<\/p>\n\n\n\n<p>\u201cSugar Factory\u201d Bijeljina \u2013 Overhaul of steam boilers 50 t\/h (2 units)<\/p>\n\n\n\n<p>\u201cSugar Factory\u201d Bijeljina \u2013 HPV overhaul<\/p>\n\n\n\n<p>\u201cIMLEK\u201d Lakta\u0161i \u2013 Installation of a 5 t\/h boiler room<\/p>\n\n\n\n<p>\u201cSTIROKART-PANELI\u201d Srbac \u2013 Installation of 2 steam boilers<\/p>\n\n\n\n<p>\u201cHPK\u201d Drakseni\u0107 \u2013 Reconstruction of air preheater<\/p>\n\n\n\n<p>\u201cROBOT\u201d Prijedor \u2013 Installation of hot-water connection<\/p>\n\n\n\n<p>\u201cAUTO MAX\u201d Prijedor \u2013 Installation of thermotechnical installations<\/p>\n\n\n\n<p>\u201cToplana\u201d Prijedor \u2013 Installation and fabrication of pipe construction<\/p>\n\n\n\n<p>\u201cGradska toplana\u201d Doboj \u2013 Installation of hot-water pipeline DN450<\/p>\n\n\n\n<p>\u201cToplana\u201d Prijedor \u2013 Replacement of screens on 32 MW boiler<\/p>\n\n\n\n<p>\u201cToplana\u201d Banja Luka \u2013 Replacement of screens on 58 MW boilers K-1, K-2, K-3, K-4<\/p>\n\n\n\n<p>\u201cArcelorMittal\u201d Omarska \u2013 Hot-water pipeline replacement<\/p>\n\n\n\n<p>\u201cArcelorMittal\u201d Omarska \u2013 Heating installation for GMS press plant<\/p>\n\n\n\n<p>\u201cVitaminka\u201d Banja Luka \u2013 CNG gas installation<\/p>\n\n\n\n<p>\u201cTopling\u201d d.o.o. Prnjavor \u2013 Fabrication of a part of steam boiler<\/p>\n\n\n\n<p><strong>DESIGN:<\/strong><\/p>\n\n\n\n<p>Design for reconstruction of 2\u00d730 MW hot-water boilers \u2013 \u201cGradska toplana\u201d Doboj<\/p>\n\n\n\n<p>Design for reconstruction of 6 t\/h steam boilers \u2013 \u201cKBC\u201d Banja Luka<\/p>\n\n\n\n<p>Design for reconstruction of 2\u00d78 MW hot-water boilers \u2013 \u201cArcelorMittal\u201d Omarska<\/p>\n\n\n\n<p>Design of a new 6 MW boiler room \u2013 DI \u201cLipa\u201d Omarska<\/p>\n\n\n\n<p>Design of a new 8 t\/h steam boiler room \u2013 \u201cHPK\u201d Drakseni\u0107<\/p>\n\n\n\n<p>Design of a new 3+7 t\/h steam boiler room \u2013 \u201cPrijedor\u010danka\u201d Prijedor<\/p>\n\n\n\n<p>District heating design for Zanatska Street \u2013 \u201cToplana\u201d Prijedor<\/p>\n\n\n\n<p>Design of thermal and chemical water treatment \u2013 \u201cPrijedor\u010danka\u201d Prijedor<\/p>\n\n\n\n<p>Design of ventilation system for production hall \u2013 \u201cPrijedor\u010danka\u201d Prijedor<\/p>\n\n\n\n<p>Design of heat-exchange substation \u2013 \u201cArcelorMittal\u201d Mines Prijedor<\/p>\n\n\n\n<p>Design of inclined coal conveyor \u2013 \u201cHPK\u201d Drakseni\u0107<\/p>\n\n\n\n<p>Design of technological equipment rehabilitation \u2013 \u201cOil Refinery\u201d Modri\u010da<\/p>\n\n\n\n<p>Design of general overhaul of steam boiler \u2013 \u201cOil Refinery\u201d Modri\u010da<\/p>\n\n\n\n<p>Design for overhaul of boiler IV 58 MW \u2013 \u201cToplana\u201d Banja Luka<\/p>\n\n\n\n<p>Design for overhaul of two 50 t\/h steam boilers \u2013 \u201cSugar Factory\u201d Bijeljina<\/p>\n\n\n\n<p>Design of 5 t\/h boiler room \u2013 \u201cIMLEK\u201d Lakta\u0161i<\/p>\n\n\n\n<p>Design of 2\u00d73 t\/h boiler room \u2013 \u201cSTIROKART-Paneli\u201d Srbac<\/p>\n\n\n\n<p>Design of thermotechnical installations \u2013 \u201cAUTO MAX\u201d Prijedor<\/p>\n\n\n\n<p>Design of boiler plant and dryers \u2013 \u201cPOGY\u201d Biha\u0107<\/p>\n\n\n\n<p>Design of boiler plant \u2013 DI \u201cPodgraci\u201d Gradi\u0161ka<\/p>\n\n\n\n<p><strong>LABORATORY \u2013 TESTING:<\/strong><\/p>\n\n\n\n<p>\u201cModing Junior\u201d d.o.o. Pula<br>\u201cIntec\u201d d.o.o. Br\u010dko<br>\u201cMetal Mont Miji\u0107\u201d d.o.o. Prijedor<br>\u201cUKC\u201d Banja Luka<br>\u201cHPK\u201d a.d. Drakseni\u0107<br>\u201cGradska Toplana\u201d a.d. Doboj<br>\u201cZT Komerc\u201d d.o.o. Prijedor<br>\u201cArcelorMittal\u201d Prijedor<br>\u201cImss-Trade\u201d d.o.o. Banja Luka<br>\u201cToplana\u201d a.d. Prijedor<br>\u201cMontmonta\u017ea\u201d d.o.o. Banja Luka<br>\u201cRiTE Stanari\u201d d.o.o. Stanari<br>\u201cMIP\u201d d.o.o. Prijedor<br>\u201cPrijedor\u010danka\u201d a.d. Prijedor<br>\u201cRafinerija ulja\u201d a.d. Modri\u010da<br>\u201cRafinerija nafte\u201d a.d. Brod<br>\u201cNomar\u201d d.o.o. Kne\u017eevo<br>Hydropower Plant \u201cGoluba\u010da\u201d Podgradci \u2013 Gradi\u0161ka<br>\u201cIntermetal\u201d d.o.o. Banja Luka<br>\u201cLIPA-DRVO\u201d d.o.o. Omarska<br>\u201cPMP Jel\u0161ingrad-FMG\u201d a.d. Gradi\u0161ka<br>\u201cKozara drvo\u201d d.o.o. Kozarska Dubica<br>\u201cBosnamonta\u017ea\u201d a.d. Prijedor<br>\u201cDestilacija\u201d a.d. Tesli\u0107<br>\u201cMira\u201d a.d. Prijedor<br>\u201cRiTE Ugljevik\u201d a.d. Ugljevik<br>\u201cDIP-CO\u201d d.o.o. Prijedor<br>\u201cMeggle mljekara\u201d d.o.o. Biha\u0107<br>\u201cCromex\u201d d.o.o. Prijedor<br>\u201cALFA Technics\u201d d.o.o. Kragujevac<br>\u201cHollodex\u201d d.o.o. Banja Luka<br>\u201cVitaminka\u201d a.d. Banja Luka<br>\u201cATM\u201d d.o.o. Sarajevo<br>\u201cO.O. Glide\u201d Prijedor<br>\u201cEMONT\u201d d.o.o. Bijeljina<br>\u201cNova Borja\u201d a.d. Tesli\u0107<br>\u201cRiTe Gacko\u201d a.d. Gacko<br>\u201cKrajina\u201d d.o.o. Brod<br>\u201cDM-monta\u017ea\u201d d.o.o. Brod<br>\u201cFuel Boss\u201d d.o.o. Zenica<br>\u201cNatron-Hayat\u201d d.o.o. Maglaj<br>\u201cBiha\u0107ka pivovara\u201d d.d. Biha\u0107<br>\u201cPrevent FAD\u201d d.d. Jelah<br>\u201cHIFA PETROL\u201d d.o.o. Sarajevo<br>\u201cR-S Silicon\u201d d.o.o. Mrkonji\u0107 Grad<br>\u201cMlijekoprodukt\u201d d.o.o. Kozarska Dubica<br>\u201cMetacomm\u201d d.o.o. Jajce<br>\u201cToplana\u201d a.d. Banja Luka<br>\u201cTermoelektro\u201d d.o.o. Br\u010dko<br>\u201cJ.P. Toplane\u201d d.d. Te\u0161anj<br>\u201cThermoelectric Power Plant\u201d Kakanj<br>\u201cWaterworks\u201d Banja Luka<br>\u201cHET\u2013HE na Trebi\u0161njici\u201d Trebinje<br>\u201cSika Limarstvo\u201d d.o.o. Sanski Most<br>\u201cPGP Izgradnja\u201d d.o.o. Gradi\u0161ka<br>\u201cReni In\u017einjering BH\u201d d.o.o. Bosanska Krupa<br>\u201cMG MIND\u201d d.o.o. Mrkonji\u0107 Grad<br>\u201cGeneral Hospital\u201d Prijedor<br>\u201cMontavar metalna nova\u201d d.o.o. Banja Luka<br>\u201cIntegral In\u017einjering\u201d a.d. Lakta\u0161i<br>\u201cAlumina\u201d d.o.o. Zvornik<br>\u201cFagus\u201d d.o.o. Kotor Varo\u0161<br>\u201cURBAS Maschinenfabrik GmBH\u201d V\u00f6lkermarkt<br>\u201cBr\u010dko gas \u2013 Oil Terminal\u201d d.o.o. Br\u010dko<br>\u201cTermotehnika\u201d d.o.o. Banja Luka<br>\u201cOMV BH\u201d d.o.o. Sarajevo<br>\u201cTRI BEST\u201d d.o.o. Banja Luka<br>\u201cFakom\u201d d.o.o. Banja Luka<br>\u201cTermomont-Daki\u0107\u201d d.o.o. Banja Luka<br>\u201cSugar Factory\u201d Bijeljina \u2013 Velika Obarska<br>\u201cTKS Dalekovod\u201d a.d. Doboj<br>\u201cPlin promet\u201d d.o.o. Prijedor<br>\u201cPavlovi\u0107 mont\u201d s.o.d. Banja Luka<br>\u201cNika Company\u201d d.o.o. Banja Luka<br>\u201cInter-metal\u201d d.o.o. Banja Luka<br>\u201cJP Gradsko grijanje\u201d \u010celinac<br>\u201cProjekt in\u017einjering\u201d d.o.o. Trn \u2013 Lakta\u0161i<br>\u201cFerrostil-Mont\u201d d.o.o. Prnjavor<br>\u201cNIS \u2013 Energo gas\u201d Beograd<br>\u201cTehsan\u201d d.o.o. Banja Luka<br>\u201cUNAMETAL\u201d a.d. Novi Grad<br>\u201cMljekarta DTD\u201d \u0160njegotina<br>\u201cAR-Klima\u201d d.o.o. Trn \u2013 Lakta\u0161i<br>\u201c\u017deljeznice Republike Srpske \u2013 O\u0160V\u201d Prijedor<br>\u201cTopling\u201d d.o.o. Prnjavor<br>\u201cBimal\u201d d.d. Br\u010dko<br>\u201cEnergotehnika\u201d d.o.o. Doboj<br>\u201cBoksit\u201d a.d. Mili\u0107i<br>\u201cNeomet\u201d d.o.o. Prijedor<br>\u201cTermomonta\u017ea\u201d a.d. Banja Luka<br>\u201cEnergoinvest \u2013 TDS\u201d d.d. Sarajevo<br>\u201cGAS TEH\u201d d.o.o. In\u0111ija<br>\u201cTehnomont\u201d d.o.o. Br\u010dko<br>\u201cDI Nova Vrbas\u201d d.o.o. Banja Luka<br>\u201cDubicotton\u201d d.o.o. Kozarska Dubica<br>\u201c\u0160umil\u201d d.o.o. Kozarska Dubica<br>\u201cDelta Petrol\u201d d.o.o. Kakanj<br>\u201cNiskogradnja\u201d d.o.o. Lakta\u0161i<br>\u201cVamix-pobjeda\u201d d.o.o. Modri\u010da<br>\u201cGrme\u010d-Gradnja\u201d d.o.o. Banja Luka<br>\u201cTGT\u201d a.d. Lakta\u0161i<br>\u201cBanjalu\u010dka pivara\u201d a.d. Banja Luka<\/p>\n<\/body>","protected":false},"excerpt":{"rendered":"<p>Our services are trusted by leading companies in the energy, oil, construction, and metalworking industries.Trust and quality are the foundation of our business. CONSTRUCTION: \u201cGradska toplana\u201d Doboj \u2013 Overhaul of hot-water boilers 2\u00d730 MW; overhaul of the tube system \u201cBanjalu\u010dka pivara\u201d \u2013 Continuous supply of steam boilers 16 and 20 t\/h; replacement of return chambers &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/tipo-ndt.com\/index.php\/references-clients\/\" class=\"more-link\">Nastavi \u010ditati<span class=\"screen-reader-text\"> &#8220;References \/ Clients&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-228","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/pages\/228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/comments?post=228"}],"version-history":[{"count":1,"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/pages\/228\/revisions"}],"predecessor-version":[{"id":230,"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/pages\/228\/revisions\/230"}],"wp:attachment":[{"href":"https:\/\/tipo-ndt.com\/index.php\/wp-json\/wp\/v2\/media?parent=228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}